Hornby BR, Operating Maintenance Crane - Era 4
Product Code: R60077
Production Details:
The breakdown crane is as much a part of railway
infrastructure as much as it is a wagon. Such cranes began to appear
in 1875, growing in size and complexity. Hornby BR, Operating Maintenance Crane - Era 4.
BR employed some of the largest rail cranes, with the heaviest of
the lot designed for the heaviest of tasks, such as the re-railing
of locomotives, or tasks that may see a locomotive needing to be
removed from the track all together. Technical Specification & Detail:
Item Length (cm): 12, Item Scale: 1:76 Scale 00 Gauge, Operator:
BR, Designer: BR, Livery: BR Black, Minimum Curve (mm): Radius 2.